Home Search Results Under construction Energy facility Energy HUB "Nebojša" Pljevlja: Hybrid system (Wind, Solar, BESS) - Investment opportunity
Energy facility

Energy HUB "Nebojša" Pljevlja: Hybrid system (Wind, Solar, BESS) - Investment opportunity

€1,500,000
3,500,000 sqft
Under construction
Listing ID: 34597
Added 2 months ago

Exclusive Investment Opportunity: Energy HUB "Nebojša" Goli Lisac (Pljevlja, Montenegro) - Integrated Mega-Infrastructural Project of Regional Significance

We are proud to present one of the most promising and profitable projects in the sector of renewable energy sources (RES) in Southeast Europe. Energy HUB "Nebojša" is not just a classic power plant, but a monumental, technologically integrated and scalable energy system designed to transform the energy picture of the region.

WHY IS THIS A HUB AND NOT AN ORDINARY PROJECT?

  • Absolute ownership 1/1: 3.500.000 m² (350 hectares) of unencumbered private land.
  • ECC study conducted: The EKC study for the connection by Elektroprenos of Montenegro has officially been completed, which gives the project maximum institutional credibility..
  • Own Substation (TS): Completely integrated within the technical solution.
  • Top-notch network connectivity: The connection point and the HUB intercontinental hub are only 1.300 meters away from the key 220 kV transmission line.
  • Direct regional connection: The Pljevlja-Bajina Bašta interconnection connects the system directly to the Serbian network and the wider regional market.

Structure and Technical Capacities of the Project

The project is divided into three complementary segments that enable phased construction, risk diversification and maximum operational flexibility:

  • Wind power plant (Wind): Capacity up to 160 MW with already obtained Urban-Technical Conditions (UTU).
  • Solar Power Plant (Solar): Capacity from 61 MW.
  • Battery Storage System (BESS): Capacity from 60 MW to 200 MW, crucial for grid stabilization and electricity arbitrage.

The current status of the development is at a high near-RTB (Ready-to-Build) stage, with signed design contracts, thus minimizing operational and network risks.

Strategic and Market Advantages

  • Elimination of network risk: Interconnection proximity dramatically increases technical feasibility and simplifies connection approval procedures.
  • Regional energy trading: A direct connection to the 220 kV network of Serbia enables the placement and sale of energy throughout the Balkans and Europe at premium prices.
  • High bankability: Due to the resolved property-legal status (1/1 ownership) and technical advantages, the project is extremely quickly evaluated by international financial institutions.

INVESTMENT OFFER

Purchase of the 61,35 MW solar power plant project

If you are interested in purchasing a 61,35 MW solar power plant project, the transaction is realized through the takeover of the project company, which has a concession for a period of 30 years.

The price of solar production capacity is 150.000 EUR per 1 MW.

As part of the project, the investor gains access to the power grid through a transformer station that is currently under construction. The connection will be realized at a distance of only 1.300 meters from the international 220 kV transmission line. The final technical parameters and connection conditions are in the final phase of harmonization.

If the investor wants to include an energy storage system (BESS), the rights to storage capacities can be acquired within the concession at a price of EUR 40.000 per 1 MW.

The annual rent of the land is 200.000 EUR.

At the request of the investor, we can deliver the complete technical, legal and financial documentation of the project.

Investment in the wind farm project

We offer the opportunity to participate in one of the largest renewable energy projects in the region.

The minimum investment amount is EUR 1,5 million, while larger strategic investments are also welcome.

The total value of the project is estimated at approximately EUR 200 million.

In the first phase of development, the construction and commissioning of a wind farm with an installed capacity of 120 MW is planned.

An investor who invests a minimum amount of EUR 1,5 million is entitled to 1,5% of the project's net profit. For investors with larger investment amounts, a proportional increase in the profit share is foreseen.

The start of commercial operation of the plant is planned for the end of 2029 at the latest.

We are open to cooperation with strategic investors and partners interested in participating in one of the most promising energy projects in Southeast Europe.

Investment program with guaranteed income

For investors looking for a safe investment instrument with a predictable return, we offer the following cooperation model.

An investment in the amount of EUR 1,5 million implies an annual income payment of EUR 400.000 over 20 years, in accordance with the provisions of the investment contract.

As a means of securing the return of invested capital, the investor is granted a first-line mortgage on an exclusive property located on the first line by the sea in Herceg Novi (Montenegro).

The property is located only 10 meters from the sea, in one of the most prestigious and liquid locations on the Montenegrin coast.

The special investment value of this property is given by its proximity to the three largest nautical and tourist centers on the Adriatic:

• Porto Montenegro (Tivat)
• Portonovi (Herceg Novi)
• Marina Bijela (Bijela)

Such a location ensures high liquidity of the real estate and stable growth of its market value in the long term.

Legal guarantees and investor protection

All agreed obligations between the contracting parties will be regulated by an official contract and confirmed by a notary.

The investment contract will contain a special clause protecting the interests of investors in the event of a delay in putting the energy plant into operation after the agreed deadline - the end of 2029.

According to the terms of the contract, for each full year of delay, the investor's contracted annual income is doubled.

Example:

• The standard annual income of the investor is EUR 400.000.
• In case of a delay of one year, the investor realizes an income of EUR 800.000 for that period.
• For each subsequent year of delay, double the amount of the contracted annual income is paid until the plant is put into commercial operation.

All the aforementioned obligations will be defined and confirmed by a notarized investment contract.

This mechanism provides additional protection of the investor's capital and confirms the developer's full commitment to the timely implementation of the project.

Contact and Strategic Partnership

As a renowned agency with many years of experience in real estate and capital investments, we open doors for strategic partners.

Feel free to contact us via the e-mail address budvainvestmentmontenegro@gmail.com or +38268132995 via Viber/WhatsApp.

Offer Type:
Under construction
Property Type:
Energy facility
Price:
€1,500,000
Region:
Pljevlja
Project:
Energy HUB “Nebojša”
Property Size:
3,500,000 sqft
Year Built:
2029
Listing ID:
34597
Update Date:
June 8, 2026
Publish Date:
May 27, 2026
Administrative support

Write a Review

Post as Guest
Your opinion matters
Add Photos
Minimum characters: 10

Request additional information
about this project

If you would like to learn more about available units or schedule a tour — live or online — leave your contact information.
We will contact you as soon as possible, in the way that suits you best.

Discover leading properties and secure your dream home with us. Expert guidance and support at every step.

Mediteranska 35, Budva

Useful Links

Follow Our Social Media